| 1 | Morozov R.A., Beklemeshev V.A., Khazhiev V.A., Baikin V.S. Methodological approach to improving the operational reliability of a mining equipment system. Mining equipment and electromechanics. 2026; 1(183):5-12. (In Russ., abstract in Eng.). DOI: 10.26730/1816-4528-2026-1-5-12 | MORE INFO | DOWNLOAD |
|---|---|---|---|
| 2 | Morozov R.A., Beklemeshev V.A., Khazhiev V.A., Baikin V.S. Improving the operational reliability of a mining equipment system based on the risk of production process failure. Mining equipment and electromechanics. 2026; 1(183):13-20. (In Russ., abstract in Eng.). DOI: 10.26730/1816-4528-2026-1-13-20 | MORE INFO | DOWNLOAD |
| 3 | Azev V.A., Beklemeshev V.A., Gabbasov B.M., Khazhiev V.A. Analysis of the quality assessment of the organization of repair maintenance of mining equipment at enterprises in SUEK-Khakassia LLC. Mining equipment and electromechanics. 2026; 1(183):21-31. (In Russ., abstract in Eng.). DOI: 10.26730/1816-4528-2026-1-21-31 | MORE INFO | DOWNLOAD |
| 4 | Azev V.A., Senatorov D.S., Dobrov A.N., Baikin V.S. An approach to improving the performance of auxiliary equipment at a coal mining plant. Mining equipment and electromechanics. 2026; 1(183):32-40. (In Russ., abstract in Eng.). DOI: 10.26730/1816-4528-2026-1-32-40 | MORE INFO | DOWNLOAD |
| 5 | Nateikin Yu.A., Dobrov A.N., Azev D.V., Gabbasov B.M. Analysis of the results of the evaluation and training of hydraulic excavator operators at SUEK-Khakassia's open-cast coal mines. Mining equipment and electromechanics. 2026; 1(183):41-51. (In Russ., abstract in Eng.). DOI: 10.26730/1816-4528-2026-1-41-51 | MORE INFO | DOWNLOAD |
| 6 | Dobrov A.N., Azev D.V., Maslyukov S.P. Reducing financial costs for transporting rock mass based on assessment and improvement of qualification of dump truck drivers (in the conditions of the Chernogorskiy open-mine). Mining equipment and electromechanics. 2026; 1(183):52-61. (In Russ., abstract in Eng.). DOI: 10.26730/1816-4528-2026-1-52-61 | MORE INFO | DOWNLOAD |
| 7 | Ablaev R.B., Saitbatalov R.R., Kilsinbaev V.S., Isyangildin R.F. Improving the efficiency and maintenance of underground mining equipment: the experience of JSC Buribaevsky GOK. Mining equipment and electromechanics. 2026; 1(183):62-72. (In Russ., abstract in Eng.). DOI: 10.26730/1816-4528-2026-1-62-72 | MORE INFO | DOWNLOAD |
| 8 | Baikin V.S. Justification of the criterion of efficiency of operation of mining equipment. Mining equipment and electromechanics. 2026; 1(183):73-82. (In Russ., abstract in Eng.). DOI: 10.26730/1816-4528-2026-1-73-82 | MORE INFO | DOWNLOAD |
| 9 | Terekhin E.P., Hvorostyanova V.I., Mametyev L.E., Pashkov D.A. Improving the efficiency of the classification process of iron-containing quartzite using CAVEX-type hydrocyclones at the KMA iron-ore enterprises. Mining equipment and electromechanics. 2026; 1(183):92-100. (In Russ., abstract in Eng.). DOI: 10.26730/1816-4528-2026-1-92-100 | MORE INFO | DOWNLOAD |
| 10 | Anikanov D.S., Semykina I.Yu., Zakharova A.G., Kiperwasser M.V., Lebedev G.M. Developing diagnostic criteria for emergency operating modes of a belt conveyor electromechanical complex by adaptation of a mathematical model during experimental tests of real equipment. Mining equipment and electromechanics. 2026; 1(183):100-109. (In Russ., abstract in Eng.). DOI: 10.26730/1816-4528-2026-1-100-109 | MORE INFO | DOWNLOAD |
| 11 | Lobur I.A., Kotlyarov R.V. Development of a system for automatic control of steam turbine network water temperature. Mining equipment and electromechanics. 2026; 2(184):3-9. (In Russ., abstract in Eng.). DOI: 10.26730/1816-4528-2026-2-3-9 | MORE INFO | DOWNLOAD |
| 12 | Belyaevsky R.V., Ovchinnikov A.G. Development of a concept for an intelligent electric power system with an active-adaptive grid taking into account the features of pricing and energy saving. Mining equipment and electromechanics. 2026; 2(184):10-20. (In Russ., abstract in Eng.). DOI: 10.26730/1816-4528-2026-2-10-20 | MORE INFO | DOWNLOAD |
| 13 | Leonova Yu.Yu., Negadaev V.A. The analysis and the selection of filtrocompensating devices in networks with pulse converters. Mining equipment and electromechanics. 2026; 2(184):21-31. (In Russ., abstract in Eng.). DOI: 10.26730/1816-4528-2026-2-21-31 | MORE INFO | DOWNLOAD |
| 14 | Chicherin I.V., Slesarenko V.V. Electrotechnical processes of energy consumption management in smart grid. Mining equipment and electromechanics. 2026; 2(184):32-38. (In Russ., abstract in Eng.). DOI: 10.26730/1816-4528-2026-2-32-38 | MORE INFO | DOWNLOAD |
| 15 | Demchenko I.I., Popov N.A., Ignatova O.S. On preventing adhesion to the support surfaces of walking excavators using rubber products. Mining equipment and electromechanics. 2026; 2(184):39-46. (In Russ., abstract in Eng.). DOI: 10.26730/1816-4528-2026-2-39-46 | MORE INFO | DOWNLOAD |
| 16 | Gericke P.B., Eshherkin P.V. Analysis of the actual condition of electric and hydraulic mining excavators using the example of the Taldinsky mine. Mining equipment and electromechanics. 2026; 2(184):47-55. (In Russ., abstract in Eng.). DOI: 10.26730/1816-4528-2026-2-47-55 | MORE INFO | DOWNLOAD |
| 17 | Aksenov V.V., Pashkov D.A., Muagkih I.D., Romanov Yu.A. Justification of the need to develop geohod maneuvering system devices. Mining equipment and electromechanics. 2026; 2(184):56-65. (In Russ., abstract in Eng.). DOI: 10.26730/1816-4528-2026-2-56-65 | MORE INFO | DOWNLOAD |
| 18 | Mamaeva M.S., Khoreshok A.A., Udalova J.S. Justification of combined digital models of the excavation process wet loam. Mining equipment and electromechanics. 2026; 2(184):66-76. (In Russ., abstract in Eng.). DOI: 10.26730/1816-4528-2026-2-66-76 | MORE INFO | DOWNLOAD |
| 19 | Cherkasov P.V., Khudonogov D.Yu., Kizilov S.A., Nikitenko M.S. Assessing the impact of airborne dust and humidity in mine workings on machine vision system efficiency. Mining equipment and electromechanics. 2026; 2(184):77-84. (In Russ., abstract in Eng.). DOI: 10.26730/1816-4528-2026-2-77-84 | MORE INFO | DOWNLOAD |
| 20 | Khoreshok A.A., Preis E.V., Pashkov D.A. Need justification for the use of executive bodies of the helicoid form geokhod. Mining equipment and electromechanics. 2026; 2(184):85-94. (In Russ., abstract in Eng.). DOI: 10.26730/1816-4528-2026-2-85-94 | MORE INFO | DOWNLOAD |
| 21 | Fomin A.I., Ushakov E.N. Rationale for choosing the design of a catching device for a bremsberg belt conveyor in coal mines. Mining equipment and electromechanics. 2026; 2(184):95-103. (In Russ., abstract in Eng.). DOI: 10.26730/1816-4528-2026-2-95-103 | MORE INFO | DOWNLOAD |
This work is licensed under a Creative Commons Attribution 4.0 License.