| 1 | Aksenov V.V., Sadovets V.Yu., Preis E.V., Pashkov D.А. Improvement of the mathematical model for determining the cutting load parameters of geokhod blade effector. Mining equipment and electromechanics. 2018; 5(139):16-21. (In Russ., abstract in Eng.). DOI: 10.26730/1816-4528-2018-5-16-21 | MORE INFO | DOWNLOAD |
|---|---|---|---|
| 2 | Aksenov V.V., Sadovets V.Yu., Pashkov D.А. Development of a methodology for determining energy capacity rock destruction by knife executive geodain authority. Mining equipment and electromechanics. 2019; 2(142):30-38. (In Russ., abstract in Eng.). DOI: 10.26730/1816-4528-2019-2-30-38 | MORE INFO | DOWNLOAD |
| 3 | Aksenov V.V., Sadovets V.Yu., Pashkov D.А., Zakharov A.Yu. Influence of the shape of the cutting edge on the cutting force of the knife executive body. Mining equipment and electromechanics. 2020; 1(147):30-36. (In Russ., abstract in Eng.). DOI: 10.26730/1816-4528-2020-1-30-36 | MORE INFO | DOWNLOAD |
| 4 | Aksenov V.V., Beglyakov V.Yu., Koperchuk A.V., Blashchuk M.Yu., Sadovets V.Yu., Pashkov D.А. Creation of passing underground devices interacting with the geological media. area of research. Mining equipment and electromechanics. 2020; 2(148):3-12. (In Russ., abstract in Eng.). DOI: 10.26730/1816-4528-2020-2-3-12 | MORE INFO | DOWNLOAD |
| 5 | Aksenov V.V., Magazov S.V., Khoreshok A.A., Beglyakov V.Yu., Koperchuk A.V., Pashkov D.А. Center for testing tunneling underground apparatus interacting with the geo-environment. Areas of research. Mining equipment and electromechanics. 2020; 4(150):65-70. (In Russ., abstract in Eng.). DOI: 10.26730/1816-4528-2020-4-65-70 | MORE INFO | DOWNLOAD |
| 6 | Dubinkin D.M., Pashkov D.А., Architsky N.A. Transmission design solution justification of autonomous mining dump truck lifting capacity up to 90 tons. Mining equipment and electromechanics. 2021; 3(155):12-19. (In Russ., abstract in Eng.). DOI: 10.26730/1816-4528-2021-3-12-19 | MORE INFO | DOWNLOAD |
| 7 | Aksenov V.V., Khoreshok A.A., Beglyakov V.Yu., Pashkov D.А. Geodynamics of underground apparatuses. The formula is a specialty, research. Mining equipment and electromechanics. 2021; 3(155):39-47. (In Russ., abstract in Eng.). DOI: 10.26730/1816-4528-2021-3-39-47 | MORE INFO | DOWNLOAD |
| 8 | Dubinkin D.M., Pashkov D.А., Ushakov A.E. Type of front suspension justification of an autonomous mining dump truck with a load capacity of up to 90 tons. Mining equipment and electromechanics. 2021; 5(157):10-18. (In Russ., abstract in Eng.). DOI: 10.26730/1816-4528-2021-5-10-18 | MORE INFO | DOWNLOAD |
| 9 | Dubinkin D.M., Kartashov A.B., Arutyunyan G.A., Kolyako A.V., Sadovets V.Yu., Pashkov D.А. Development of a program and methodology for preliminary testing of an autonomous quarry dump truck. Mining equipment and electromechanics. 2021; 6(158):59-65. (In Russ., abstract in Eng.). DOI: 10.26730/1816-4528-2021-6-59-65 | MORE INFO | DOWNLOAD |
This work is licensed under a Creative Commons Attribution 4.0 License.