logo

Search of articles

Reset

Search result

Найдено: 10
1Aksenov V.V., Sadovets V.Yu., Preis E.V., Pashkov D.А. Improvement of the mathematical model for determining the cutting load parameters of geokhod blade effector. Mining equipment and electromechanics. 2018; 5(139):16-21. (In Russ., abstract in Eng.). DOI: 10.26730/1816-4528-2018-5-16-21 MORE INFO DOWNLOAD
2Aksenov V.V., Sadovets V.Yu., Pashkov D.А. Development of a methodology for determining energy capacity rock destruction by knife executive geodain authority. Mining equipment and electromechanics. 2019; 2(142):30-38. (In Russ., abstract in Eng.). DOI: 10.26730/1816-4528-2019-2-30-38 MORE INFO DOWNLOAD
3Aksenov V.V., Sadovets V.Yu., Pashkov D.А., Zakharov A.Yu. Influence of the shape of the cutting edge on the cutting force of the knife executive body. Mining equipment and electromechanics. 2020; 1(147):30-36. (In Russ., abstract in Eng.). DOI: 10.26730/1816-4528-2020-1-30-36 MORE INFO DOWNLOAD
4Aksenov V.V., Beglyakov V.Yu., Koperchuk A.V., Blashchuk M.Yu., Sadovets V.Yu., Pashkov D.А. Creation of passing underground devices interacting with the geological media. area of research. Mining equipment and electromechanics. 2020; 2(148):3-12. (In Russ., abstract in Eng.). DOI: 10.26730/1816-4528-2020-2-3-12 MORE INFO DOWNLOAD
5Dubinkin D.М., Sadovets V.Yu., Syrkin I.S., Chicherin I.V. Development of the structure for the unmanned mining dump truck control system. Mining equipment and electromechanics. 2020; 6(152):25-30. (In Russ., abstract in Eng.). DOI: 10.26730/1816-4528-2020-6-25-30 MORE INFO DOWNLOAD
6Aksenov V.V., Kazantsev A.A., Sadovets V.Yu. Development of requirements for the tunnel lining construction system for geokhod technology. Mining equipment and electromechanics. 2021; 4(156):37-44. (In Russ., abstract in Eng.). DOI: 10.26730/1816-4528-2021-4-37-44 MORE INFO DOWNLOAD
7Dubinkin D.M., Kartashov A.B., Arutyunyan G.A., Kolyako A.V., Sadovets V.Yu., Pashkov D.А. Development of a program and methodology for preliminary testing of an autonomous quarry dump truck. Mining equipment and electromechanics. 2021; 6(158):59-65. (In Russ., abstract in Eng.). DOI: 10.26730/1816-4528-2021-6-59-65 MORE INFO DOWNLOAD
8Sadovets V.Yu., Rezanova E.V., Sadovets R.V., Sannikov A.K. Development of requirements for the inertial positioning system of mining machines. Mining equipment and electromechanics. 2022; 3(161):3-12. (In Russ., abstract in Eng.). DOI: 10.26730/1816-4528-2022-3-3-12 MORE INFO DOWNLOAD
9Sadovets V.Yu., Turgenev I.A., Sadovets R.V. Developing requirements for an exoskeleton for mining operations. Mining equipment and electromechanics. 2023; 1(165):3-10. (In Russ., abstract in Eng.). DOI: 10.26730/1816-4528-2023-1-3-10 MORE INFO DOWNLOAD
10Zaitsev L.A., Bokarev A.I., Dianov V.A., Neskin I.V., Sadovets V.Yu., Zakrasovsky D.I. Experimental data collection about dump truck BELAZ-7530 operation in an open pit mine (part 1). Mining equipment and electromechanics. 2025; 4(180):83-90. (In Russ., abstract in Eng.). DOI: 10.26730/1816-4528-2025-4-83-90 MORE INFO DOWNLOAD

Обложка

This work is licensed under a Creative Commons Attribution 4.0 License.