| 1 | Gericke P.B. Classification of defects of generator groups of draglines applicable to creating clipping algorithms. Mining equipment and electromechanics. 2019; 2(142):22-29. (In Russ., abstract in Eng.). DOI: 10.26730/1816-4528-2019-2-22-29 | MORE INFO | DOWNLOAD |
|---|---|---|---|
| 2 | Aksenov V.V., Sadovets V.Yu., Pashkov D.А. Development of a methodology for determining energy capacity rock destruction by knife executive geodain authority. Mining equipment and electromechanics. 2019; 2(142):30-38. (In Russ., abstract in Eng.). DOI: 10.26730/1816-4528-2019-2-30-38 | MORE INFO | DOWNLOAD |
| 3 | Shibaeva D.N., Shumilov P.A., Bulatov V.V., Tereshchenko S.V. Determination of the boundary capacity of a radiometric separator using immitation modeling. Mining equipment and electromechanics. 2019; 2(142):39-45. (In Russ., abstract in Eng.). DOI: 10.26730/1816-4528-2019-2-39-45 | MORE INFO | DOWNLOAD |
| 4 | Buryy G.G., Poteryaev I.K., Skobelew S.B., Kovalevskiy V.F. Research of forces resistance forces on a new structure of a bucket hydraulic excavator. Mining equipment and electromechanics. 2019; 2(142):46-51. (In Russ., abstract in Eng.). DOI: 10.26730/1816-4528-2019-2-46-51 | MORE INFO | DOWNLOAD |
| 5 | Komissarov A.P., Lagunova Yu.A., Shestakov V.S., Lukashuk O.A. Evaluation of standard parameters of the main mechanisms of the “GORNYI” excavator. Mining equipment and electromechanics. 2019; 3(143):3-8. (In Russ., abstract in Eng.). DOI: 10.26730/1816-4528-2019-3-3-8 | MORE INFO | DOWNLOAD |
| 6 | Letnev K.Yu Energy intensity of the rock excavation process by an open-pit excavator with the front shovel type implement. Mining equipment and electromechanics. 2019; 3(143):9-13. (In Russ., abstract in Eng.). DOI: 10.26730/1816-4528-2019-3-9-13 | MORE INFO | DOWNLOAD |
| 7 | Lukashuk O.A. Regularities of forming the standard parameters of main mechanisms of open-pit excavator in the process of rock excavation. Mining equipment and electromechanics. 2019; 3(143):14-17. (In Russ., abstract in Eng.). DOI: 10.26730/1816-4528-2019-3-14-17 | MORE INFO | DOWNLOAD |
| 8 | Mayorov S.A., Lagunova Yu.A Advantages and disadvantages of mobile crushers. Mining equipment and electromechanics. 2019; 3(143):18-26. (In Russ., abstract in Eng.). DOI: 10.26730/1816-4528-2019-3-18-26 | MORE INFO | DOWNLOAD |
| 9 | Semenkin A.V., Antonov V.A. A study and comparative analysis of technological indicators of automobile and conveyor transport in deep pits. Mining equipment and electromechanics. 2019; 3(143):27-32. (In Russ., abstract in Eng.). DOI: 10.26730/1816-4528-2019-3-27-32 | MORE INFO | DOWNLOAD |
| 10 | Safronov V.P., Zaytsev Y.V. Simulation model and calculation program for the mechanical system of executive body of the hydraulic excavator. Mining equipment and electromechanics. 2019; 3(143):33-38. (In Russ., abstract in Eng.). DOI: 10.26730/1816-4528-2019-3-33-38 | MORE INFO | DOWNLOAD |
| 11 | Suslov N.M., Chernukhin S.A., Suslov D.N. Features of the hydraulic drive of dragline walking mechanism. Mining equipment and electromechanics. 2019; 3(143):39-42. (In Russ., abstract in Eng.). DOI: 10.26730/1816-4528-2019-3-39-42 | MORE INFO | DOWNLOAD |
| 12 | Yudin A.V., Shestakov V.S. Justification of parameters of open-pit transshipment points with gravitational movement of broken roc. Mining equipment and electromechanics. 2019; 3(143):43-49. (In Russ., abstract in Eng.). DOI: 10.26730/1816-4528-2019-3-43-49 | MORE INFO | DOWNLOAD |
| 13 | Voronov A.Y., Khoreshok A.A., Voronov Yu.E., Zhdanov V.L., Voronov A.Y. Justificating the quality indicators of the shovel-truck system operation at open-pit mines. Mining equipment and electromechanics. 2019; 4(144):3-9. (In Russ., abstract in Eng.). DOI: 10.26730/1816-4528-2019-4-3-9 | MORE INFO | DOWNLOAD |
| 14 | Kantovich L.I., Dmitrienko V.G., Shemetov E.G., Navarrete W.S. Determination of strength of specific resistance of tracked track of a career excavator 4100-ХРС by using SOLIDWORKS automated design system. Mining equipment and electromechanics. 2019; 4(144):10-14. (In Russ., abstract in Eng.). DOI: 10.26730/1816-4528-2019-4-10-14 | MORE INFO | DOWNLOAD |
| 15 | Khoreshok A.A., Ananiev K.A., Ermakov A.N., Shakhmanov V.N. Justification of the installation scheme and the rotation direction of the drums on the executive body of the geokhod. Mining equipment and electromechanics. 2019; 4(144):15-20. (In Russ., abstract in Eng.). DOI: 10.26730/1816-4528-2019-4-15-20 | MORE INFO | DOWNLOAD |
| 16 | Kopytin D.V., Gerike B.L., Ananiev K.A., Ermakov A.N. Environmental influence on the flow parameter of hydraulic equipment failure of superior highwall miner systems. Mining equipment and electromechanics. 2019; 4(144):21-25. (In Russ., abstract in Eng.). DOI: 10.26730/1816-4528-2019-4-21-25 | MORE INFO | DOWNLOAD |
| 17 | Voronov Yu.E., Kosolapov A.V., Voronov A.Y., Romashko V.G., Voronov A.Y. Integrated assessment of the technical level of mechanical equipment for open-pit mines. Mining equipment and electromechanics. 2019; 4(144):26-33. (In Russ., abstract in Eng.). DOI: 10.26730/1816-4528-2019-4-26-33 | MORE INFO | DOWNLOAD |
| 18 | Ozornin M.S., Shishlyannikov D.I., Romanov V.A., Lopouhov V.A. Methods for determination of mechanized combine system performance taking into account conventional units of work. Mining equipment and electromechanics. 2019; 4(144):34-39. (In Russ., abstract in Eng.). DOI: 10.26730/1816-4528-2019-4-34-39 | MORE INFO | DOWNLOAD |
| 19 | Voronov A.Y., Stenina N.A., Voronov Yu.E. Dispatching systems at open-pit mines: the past, the present and the future. Mining equipment and electromechanics. 2019; 4(144):40-47. (In Russ., abstract in Eng.). DOI: 10.26730/1816-4528-2019-4-40-47 | MORE INFO | DOWNLOAD |
| 20 | Voronov A.Yu., Voronov Yu.E. Multistage model for shovel-truck system management at open-pit coal mines. Mining equipment and electromechanics. 2019; 5(145):8-15. (In Russ., abstract in Eng.). DOI: 10.26730/1816-4528-2019-5-8-15 | MORE INFO | DOWNLOAD |
| 21 | Gericke P.B., Nikitin A.G. Jaw crushers vibration analysis. Mining equipment and electromechanics. 2019; 5(145):16-22. (In Russ., abstract in Eng.). DOI: 10.26730/1816-4528-2019-5-16-22 | MORE INFO | DOWNLOAD |
| 22 | Liberman Ya. L., Gorbunova L.N. Ways to reduce energy consumption by transporting machines. Mining equipment and electromechanics. 2019; 5(145):23-28. (In Russ., abstract in Eng.). DOI: 10.26730/1816-4528-2019-5-23-28 | MORE INFO | DOWNLOAD |
| 23 | Liberman Ya.L., Letnev K.Yu., Gorbunova L.N. Development of an energy-economic management system vibration conveyor. Mining equipment and electromechanics. 2019; 5(145):29-32. (In Russ., abstract in Eng.). DOI: 10.26730/1816-4528-2019-5-29-32 | MORE INFO | DOWNLOAD |
| 24 | Stenin D.V Prospects for the development of the pro-duction of autonomous heavy platforms for un-manned mining. Mining equipment and electromechanics. 2019; 6(146):3-8. (In Russ., abstract in Eng.). DOI: 10.26730/1816-4528-2019-6-3-8 | MORE INFO | DOWNLOAD |
| 25 | Dubinkin D.M. Current state of technics and technologies in the field of autonomous control movement vehicles of coal mine caree. Mining equipment and electromechanics. 2019; 6(146):8-15. (In Russ., abstract in Eng.). DOI: 10.26730/1816-4528-2019-6-8-15 | MORE INFO | DOWNLOAD |
| 26 | Voronov A.Yu., Voronov Yu.E. Current state and development prospects of the autonomous haulage at open-pit mines. Mining equipment and electromechanics. 2019; 6(146):16-24. (In Russ., abstract in Eng.). DOI: 10.26730/1816-4528-2019-6-16-24 | MORE INFO | DOWNLOAD |
| 27 | Levashova E.E. Development of the technological process algorithm for restoration of fast-wearing parts of a mining excavator. Mining equipment and electromechanics. 2019; 6(146):25-32. (In Russ., abstract in Eng.). DOI: 10.26730/1816-4528-2019-6-25-32 | MORE INFO | DOWNLOAD |
| 28 | Stovmanenko A.Yu., Volkov E.P., Anushenkov A.N. Improving the efficiency of pipeline transport of stowage mixes in the conditions of underground mining of mineral deposits. Mining equipment and electromechanics. 2019; 6(146):33-41. (In Russ., abstract in Eng.). DOI: 10.26730/1816-4528-2019-6-33-41 | MORE INFO | DOWNLOAD |
| 29 | Khoreshok A.A., Stenina N.А., Kudrevatykh A.V., Ashcheulov A.S. Method for determining the rational utilization factor of the load capacity of quarry dump trucks. Mining equipment and electromechanics. 2020; 1(147):3-9. (In Russ., abstract in Eng.). DOI: 10.26730/1816-4528-2020-1-3-9 | MORE INFO | DOWNLOAD |
| 30 | Bochkaryov Yu.S., Boyarov M.M. The reliability assessment of BELAZ-7540 dump truck at the placer deposits. Mining equipment and electromechanics. 2020; 1(147):10-15. (In Russ., abstract in Eng.). DOI: 10.26730/1816-4528-2020-1-10-15 | MORE INFO | DOWNLOAD |
| 31 | Bochkaryov Yu.S., Boyarov M.M. Factors impacting failure-free operation of BELAZ-7540 dump trucks at the placer deposits of the north. Mining equipment and electromechanics. 2020; 1(147):16-22. (In Russ., abstract in Eng.). DOI: 10.26730/1816-4528-2020-1-16-22 | MORE INFO | DOWNLOAD |
| 32 | Yurchenko V.M. Reconstruction of conveyor transport in the inclined shaft of the "Raspadskaya» mine. Mining equipment and electromechanics. 2020; 1(147):23-29. (In Russ., abstract in Eng.). DOI: 10.26730/1816-4528-2020-1-23-29 | MORE INFO | DOWNLOAD |
| 33 | Aksenov V.V., Sadovets V.Yu., Pashkov D.А., Zakharov A.Yu. Influence of the shape of the cutting edge on the cutting force of the knife executive body. Mining equipment and electromechanics. 2020; 1(147):30-36. (In Russ., abstract in Eng.). DOI: 10.26730/1816-4528-2020-1-30-36 | MORE INFO | DOWNLOAD |
| 34 | Buryy G.G., Poteryaev I.K., Skobelew S.B., Kovalevskiy V.F. Comparison of the digging process by the standard excavator bucket and the new design bucket. Mining equipment and electromechanics. 2020; 1(147):37-44. (In Russ., abstract in Eng.). DOI: 10.26730/1816-4528-2020-1-37-44 | MORE INFO | DOWNLOAD |
| 35 | Paskar I.N., Moskaleva K.А. Оptimization of power supply system of Kemerovo region by means of multi-agent approach. Mining equipment and electromechanics. 2020; 1(147):45-52. (In Russ., abstract in Eng.). DOI: 10.26730/1816-4528-2020-1-45-52 | MORE INFO | DOWNLOAD |
| 36 | Paskar I.N., Berezin D.S., Gerasimov M.A., Savenkova Daria E., Karakulova J.Y., Tsimbalist E.E., Khamidulina D.V., Aksenova A.A., Klimenkova S.E., Mescherjakov N.A. Transition to «digital» is inevitable: how electricity is changing with the introduction of digital and intelligent systems. Mining equipment and electromechanics. 2020; 1(147):53-64. (In Russ., abstract in Eng.). DOI: 10.26730/1816-4528-2020-1-53-64 | MORE INFO | DOWNLOAD |
| 37 | Aksenov V.V., Beglyakov V.Yu., Koperchuk A.V., Blashchuk M.Yu., Sadovets V.Yu., Pashkov D.А. Creation of passing underground devices interacting with the geological media. area of research. Mining equipment and electromechanics. 2020; 2(148):3-12. (In Russ., abstract in Eng.). DOI: 10.26730/1816-4528-2020-2-3-12 | MORE INFO | DOWNLOAD |
| 38 | Voronov A.Yu. A mathematical model for optimization of mining shovel-truck system operation. Mining equipment and electromechanics. 2020; 2(148):13-18. (In Russ., abstract in Eng.). DOI: 10.26730/1816-4528-2020-2-13-18 | MORE INFO | DOWNLOAD |
| 39 | Voronov A.Yu., Khoreshok A.A., Voronov Yu.E., Bujankin A.V., Voronov A.Yu. Assessment of the operation quality of shovel-truck systems at open-pit coal mines in Kuzbass. Mining equipment and electromechanics. 2020; 2(148):19-26. (In Russ., abstract in Eng.). DOI: 10.26730/1816-4528-2020-2-19-26 | MORE INFO | DOWNLOAD |
| 40 | Gericke P.B. Identification of defects in energy-mechanical equipment of crushing and classification plants. Mining equipment and electromechanics. 2020; 2(148):27-34. (In Russ., abstract in Eng.). DOI: 10.26730/1816-4528-2020-2-27-34 | MORE INFO | DOWNLOAD |
| 41 | Drygin M.Yu. Analysis of technical maintenance systems and repair of mining equipment. Mining equipment and electromechanics. 2020; 2(148):35-43. (In Russ., abstract in Eng.). DOI: 10.26730/1816-4528-2020-2-35-43 | MORE INFO | DOWNLOAD |
| 42 | Drygin M.Yu. Technical diagnostics of the main mining equipment. Mining equipment and electromechanics. 2020; 2(148):44-50. (In Russ., abstract in Eng.). DOI: 10.26730/1816-4528-2020-2-44-50 | MORE INFO | DOWNLOAD |
| 43 | Kuzin E.G., Shahmanov V.N., Kavardakov A.A. Impact of mining and geological factors on the operation of the mine conveyor drive. Mining equipment and electromechanics. 2020; 2(148):51-56. (In Russ., abstract in Eng.). DOI: 10.26730/1816-4528-2020-2-51-56 | MORE INFO | DOWNLOAD |
| 44 | Klishin V.I., Ababkov N.V., Pimonov M.V., Khudyntsev Ye.A. Simulating stress-deformed state of a support unit vibrating feeder with a discharge of sub-roof coal. Mining equipment and electromechanics. 2020; 2(148):57-63. (In Russ., abstract in Eng.). DOI: 10.26730/1816-4528-2020-2-57-63 | MORE INFO | DOWNLOAD |
| 45 | Kartashov A.B., Kositsyn B.B., Kotiev G.O., Dubinkin D.M., Nazarenko S.V. Method for determining the energy-efficient law of mining dump truck motion. Mining equipment and electromechanics. 2020; 3(149):11-24. (In Russ., abstract in Eng.). DOI: 10.26730/1816-4528-2020-3-11-24 | MORE INFO | DOWNLOAD |
| 46 | Dubinkin D.M., Kartashov A.B., Arutyunyan G.A. Justification of the number and type of tire size for unmanned dump truck. Mining equipment and electromechanics. 2020; 3(149):25-33. (In Russ., abstract in Eng.). DOI: 10.26730/1816-4528-2020-3-25-33 | MORE INFO | DOWNLOAD |
| 47 | Gericke P.B., Eshherkin P.V. Development of methods for diagnosing equipment of electric mining shovels. Mining equipment and electromechanics. 2020; 3(149):34-41. (In Russ., abstract in Eng.). DOI: 10.26730/1816-4528-2020-3-34-41 | MORE INFO | DOWNLOAD |
| 48 | Gericke P.B., Eshherkin P.V. Using the results of vibration analysis to create of unified diagnostic criterion. Mining equipment and electromechanics. 2020; 3(149):42-48. (In Russ., abstract in Eng.). DOI: 10.26730/1816-4528-2020-3-42-48 | MORE INFO | DOWNLOAD |
| 49 | Zhabin A.B., Kerimov Z.E. Analysis of research results for percussion machines. Mining equipment and electromechanics. 2020; 3(149):49-54. (In Russ., abstract in Eng.). DOI: 10.26730/1816-4528-2020-3-49-54 | MORE INFO | DOWNLOAD |
| 50 | Nikitenko S.M., Khudyntsev E.A., Kizilov S.A., Grigorenko V.Yu. Device for releasing coal to the conveyor. Mining equipment and electromechanics. 2020; 3(149):55-61. (In Russ., abstract in Eng.). DOI: 10.26730/1816-4528-2020-3-55-61 | MORE INFO | DOWNLOAD |
| 51 | Drygin M.Yu., Kuryshkin N.P. Assessment of the level of organization and efficiency of application of the SPR system for the excavator park of Kuzbass. Mining equipment and electromechanics. 2020; 4(150):16-25. (In Russ., abstract in Eng.). DOI: 10.26730/1816-4528-2020-4-16-25 | MORE INFO | DOWNLOAD |
| 52 | Drygin M.Yu. Assessment of the influence of accident and MRO system on the safety of equipment of coal pits of Kuzbass. Mining equipment and electromechanics. 2020; 4(150):26-35. (In Russ., abstract in Eng.). DOI: 10.26730/1816-4528-2020-4-26-35 | MORE INFO | DOWNLOAD |
| 53 | Gerike B.L., Drozdenko Yu.V., Ermakov A.N., Artamonov P.V., Kopytin V.D. The experience of using digital technologies in estimation of the technical state of highwall mining complex. Mining equipment and electromechanics. 2020; 4(150):36-44. (In Russ., abstract in Eng.). DOI: 10.26730/1816-4528-2020-4-36-44 | MORE INFO | DOWNLOAD |
| 54 | Utenkova T.G., Kremcheev E.A., Gromyka D.S., Korotkova O.Yu. Methods of dehydration of sapropel. Mining equipment and electromechanics. 2020; 4(150):45-52. (In Russ., abstract in Eng.). DOI: 10.26730/1816-4528-2020-4-45-52 | MORE INFO | DOWNLOAD |
| 55 | Buryy G.G., Poteryaev I.K., Skobelew S.B., Kovalevskiy V.F. Mathematical modeling of the soil digging process with a spherical bucket. Mining equipment and electromechanics. 2020; 4(150):53-58. (In Russ., abstract in Eng.). DOI: 10.26730/1816-4528-2020-4-53-58 | MORE INFO | DOWNLOAD |
| 56 | Dubinkin D.M. Justification of the need to create heavy platforms for open-pit mining. Mining equipment and electromechanics. 2020; 4(150):59-64. (In Russ., abstract in Eng.). DOI: 10.26730/1816-4528-2020-4-59-64 | MORE INFO | DOWNLOAD |
| 57 | Aksenov V.V., Magazov S.V., Khoreshok A.A., Beglyakov V.Yu., Koperchuk A.V., Pashkov D.А. Center for testing tunneling underground apparatus interacting with the geo-environment. Areas of research. Mining equipment and electromechanics. 2020; 4(150):65-70. (In Russ., abstract in Eng.). DOI: 10.26730/1816-4528-2020-4-65-70 | MORE INFO | DOWNLOAD |
| 58 | Bezkorovayny P.G., Shestakov V.S. Change of loads on working equipment hydraulic excavator when digging with the edge tooth. Mining equipment and electromechanics. 2020; 5(151):3-8. (In Russ., abstract in Eng.). DOI: 10.26730/1816-4528-2020-5-3-8 | MORE INFO | DOWNLOAD |
| 59 | Zhabin A.B., Lavit I. M., Kerimov Z.E. Results of theoretical studies of the power impulse system of a percussion instrument. Mining equipment and electromechanics. 2020; 5(151):9-15. (In Russ., abstract in Eng.). DOI: 10.26730/1816-4528-2020-5-9-15 | MORE INFO | DOWNLOAD |
| 60 | Voronova E.Y., Khazanovich G.Sh. Methodology for parametric optimization of aggregated tunneling systems. Mining equipment and electromechanics. 2020; 5(151):16-21. (In Russ., abstract in Eng.). DOI: 10.26730/1816-4528-2020-5-16-21 | MORE INFO | DOWNLOAD |
| 61 | Komissarov A.P., Khoroshavin S.A, Letnev K.Yu. Features of loading modes of ropes of lifting and pressure mechanisms of a quarry excavator. Mining equipment and electromechanics. 2020; 5(151):22-27. (In Russ., abstract in Eng.). DOI: 10.26730/1816-4528-2020-5-22-27 | MORE INFO | DOWNLOAD |
| 62 | Komissarov A.P., Lagunova Yu.A., Lukashuk O.A., Shestakov V.S. Software management of the rock excavation process by a quarry excavator. Mining equipment and electromechanics. 2020; 5(151):28-33. (In Russ., abstract in Eng.). DOI: 10.26730/1816-4528-2020-5-28-33 | MORE INFO | DOWNLOAD |
| 63 | Komissarov A.P., Lagunova Yu.A., Nabiullin R.Sh., Lukashuk O.A. Digitalization in mining engineering. Mining equipment and electromechanics. 2020; 5(151):34-38. (In Russ., abstract in Eng.). DOI: 10.26730/1816-4528-2020-5-34-38 | MORE INFO | DOWNLOAD |
| 64 | Krivenko A.E., Giang Q.K. Study of the influence of ambient temperature on the intensity of heat radiation from a hydroline in a hydraulic system of a mining hydraulic excavator. Mining equipment and electromechanics. 2020; 5(151):39-44. (In Russ., abstract in Eng.). DOI: 10.26730/1816-4528-2020-5-39-44 | MORE INFO | DOWNLOAD |
| 65 | Khazin M.L. Mining dump truck’s current collectors. Mining equipment and electromechanics. 2020; 5(151):45-50. (In Russ., abstract in Eng.). DOI: 10.26730/1816-4528-2020-5-45-50 | MORE INFO | DOWNLOAD |
| 66 | Kudrevatykh A.V., Ashcheulov A.S., Ashcheulova A.S. The wear phenomena comparative characteristics of excavators and dump trucks gearboxes. Mining equipment and electromechanics. 2020; 5(151):51-56. (In Russ., abstract in Eng.). DOI: 10.26730/1816-4528-2020-5-51-56 | MORE INFO | DOWNLOAD |
| 67 | Zakharov A.Y., Grigoryev A.V., Zakharova A.G. Overview of conveyor belt longitudinal break detect ways. Mining equipment and electromechanics. 2020; 5(151):57-63. (In Russ., abstract in Eng.). DOI: 10.26730/1816-4528-2020-5-57-63 | MORE INFO | DOWNLOAD |
| 68 | Drygin M.Yu. Evaluation of composition and wear dynamics of excavator fleet of Kuzbass coal pits. Mining equipment and electromechanics. 2020; 6(152):10-18. (In Russ., abstract in Eng.). DOI: 10.26730/1816-4528-2020-6-10-18 | MORE INFO | DOWNLOAD |
| 69 | Voronov A.Y., Khoreshok A.A., Voronov Yu.E., Romashko V.G., Voronov A.Y. Optimizing the indicators of the shovel-truck system operation at open-pit coal mines by quality criterion. Mining equipment and electromechanics. 2020; 6(152):19-24. (In Russ., abstract in Eng.). DOI: 10.26730/1816-4528-2020-6-19-24 | MORE INFO | DOWNLOAD |
| 70 | Dubinkin D.М., Sadovets V.Yu., Syrkin I.S., Chicherin I.V. Development of the structure for the unmanned mining dump truck control system. Mining equipment and electromechanics. 2020; 6(152):25-30. (In Russ., abstract in Eng.). DOI: 10.26730/1816-4528-2020-6-25-30 | MORE INFO | DOWNLOAD |
| 71 | Dubinkin D.M., Kartashov A.B., Arutyunyan G.A., Buzunov N.V., Sorokin K.P., Yalyshev A.V. Current state of the art and technologies in the field of quarry dump trucks with energy storage devices. Mining equipment and electromechanics. 2020; 6(152):31-42. (In Russ., abstract in Eng.). DOI: 10.26730/1816-4528-2020-6-31-42 | MORE INFO | DOWNLOAD |
| 72 | Drygin M.Yu. Ways to increase performance of excavator fleet of Kuzbass. Mining equipment and electromechanics. 2021; 1(153):9-17. (In Russ., abstract in Eng.). DOI: 10.26730/1816-4528-2021-1-9-17 | MORE INFO | DOWNLOAD |
| 73 | Drygin M.Yu. Application of information systems to improve the efficiency of motor equipment MRO. Mining equipment and electromechanics. 2021; 1(153):18-26. (In Russ., abstract in Eng.). DOI: 10.26730/1816-4528-2021-1-18-26 | MORE INFO | DOWNLOAD |
| 74 | Neskoromnykh V.V., Belozerov I.R., Bovin K.A. Economic criterion of the efficiency of recovery measures of weared drill bits. Mining equipment and electromechanics. 2021; 1(153):27-32. (In Russ., abstract in Eng.). DOI: 10.26730/1816-4528-2021-1-27-32 | MORE INFO | DOWNLOAD |
| 75 | Gutarevich V.O., Ignatkina E.L Reduction of dynamic loads in the rolling stock couplings of mine suspended monorail roads occurring during brakin. Mining equipment and electromechanics. 2021; 1(153):33-38. (In Russ., abstract in Eng.). DOI: 10.26730/1816-4528-2021-1-33-38 | MORE INFO | DOWNLOAD |
| 76 | Kozhukhov L.F., Astafieva V.G. Applying methods to obtain information about working mining machines in coal mines. Mining equipment and electromechanics. 2021; 1(153):39-44. (In Russ., abstract in Eng.). DOI: 10.26730/1816-4528-2021-1-39-44 | MORE INFO | DOWNLOAD |
| 77 | Pudov E.Yu., Zang K.K., Kuzin E.G., Shakhmanov V.N., Krivenko A.E. Influence of ambient temperature and type of working fluid on thermodynamic equilibrium of hydraulic system of excavators. Mining equipment and electromechanics. 2021; 1(153):45-50. (In Russ., abstract in Eng.). DOI: 10.26730/1816-4528-2021-1-45-50 | MORE INFO | DOWNLOAD |
| 78 | Pudov E.Yu., Zang K.K., Kuzin E.G., Krivenko A.E. Assessment of the impact of operating conditions on the performance of the hydraulic mining excavator working fluid cooling system. Mining equipment and electromechanics. 2021; 1(153):51-58. (In Russ., abstract in Eng.). DOI: 10.26730/1816-4528-2021-1-51-58 | MORE INFO | DOWNLOAD |
| 79 | Goryunov S.V., Khoreshok A.A. Development of a methodology for assessing the resource of large-sized tires of quarry dump trucks. Mining equipment and electromechanics. 2021; 2(154):3-10. (In Russ., abstract in Eng.). DOI: 10.26730/1816-4528-2021-2-3-10 | MORE INFO | DOWNLOAD |
| 80 | Voronov A.Y., Nesterov V.I., Voronov Yu.E., Romashko V.G., Voronov A.Y. Comparative assessment of the operation quality of shovel-truck systems at open-pit coal mines in the summer and transitional seasons. Mining equipment and electromechanics. 2021; 2(154):11-16. (In Russ., abstract in Eng.). DOI: 10.26730/1816-4528-2021-2-11-16 | MORE INFO | DOWNLOAD |
| 81 | Gericke P.B., Gericke B.L. Creation of a unified diagnostic criterion for assessing the technical condition of mining equipment. Mining equipment and electromechanics. 2021; 2(154):17-22. (In Russ., abstract in Eng.). DOI: 10.26730/1816-4528-2021-2-17-22 | MORE INFO | DOWNLOAD |
| 82 | Gromyka D.S., Gogolinskiy K.V., Kremcheev E.A. Thermal fatigue modelling of excavator teeth during cyclic heat loading. Mining equipment and electromechanics. 2021; 2(154):23-29. (In Russ., abstract in Eng.). DOI: 10.26730/1816-4528-2021-2-23-29 | MORE INFO | DOWNLOAD |
| 83 | Bogomolov A.R., Azikhanov S.S., Dubov G.M., Grigorieva E.A., Nokhrin S.A. Study of the composition of exhaust gas of dual-fuel gas-diesel BelAZ 75131 mining dump trucks. Mining equipment and electromechanics. 2021; 2(154):30-41. (In Russ., abstract in Eng.). DOI: 10.26730/1816-4528-2021-2-30-41 | MORE INFO | DOWNLOAD |
| 84 | Evstratov V.A., Voronova E.Y., Apachanov A.S., Grigoryev V.I., Sukharnikova V.A., Breslavtseva I.V. Efficiency improvement of the screw modules of mining machines. Mining equipment and electromechanics. 2021; 2(154):42-47. (In Russ., abstract in Eng.). DOI: 10.26730/1816-4528-2021-2-42-47 | MORE INFO | DOWNLOAD |
| 85 | Agapov M.E., Poteryaev I.K. Comprehensive criterion of working process efficiency chain tranch excavator. Mining equipment and electromechanics. 2021; 2(154):48-54. (In Russ., abstract in Eng.). DOI: 10.26730/1816-4528-2021-2-48-54 | MORE INFO | DOWNLOAD |
| 86 | Kuzin E.G., Рudov E.Yu., Dubinkin D.M. Analysis of failures of mining dump truck components under operating conditions. Mining equipment and electromechanics. 2021; 2(154):55-61. (In Russ., abstract in Eng.). DOI: 10.26730/1816-4528-2021-2-55-61 | MORE INFO | DOWNLOAD |
| 87 | Panasenkov D.A., Zaitsev A.P., Kartashov A.B., Pikalov N.A., Dubinkin D.M. Calculation of hydro-mechanical losses and modeling of cavitation in the channels of the hydraulic unit of a dump truck. Mining equipment and electromechanics. 2021; 3(155):3-11. (In Russ., abstract in Eng.). DOI: 10.26730/1816-4528-2021-3-3-11 | MORE INFO | DOWNLOAD |
| 88 | Dubinkin D.M., Pashkov D.А., Architsky N.A. Transmission design solution justification of autonomous mining dump truck lifting capacity up to 90 tons. Mining equipment and electromechanics. 2021; 3(155):12-19. (In Russ., abstract in Eng.). DOI: 10.26730/1816-4528-2021-3-12-19 | MORE INFO | DOWNLOAD |
| 89 | Dubov G.M., Bogomolov A.R., Azikhanov S.S., Grigorieva E.A., Nokhrin S.A. Study of fuel consumption and temperature characteristics of gas-diesel BelAZ 75131 dump trucks. Mining equipment and electromechanics. 2021; 3(155):20-31. (In Russ., abstract in Eng.). DOI: 10.26730/1816-4528-2021-3-20-31 | MORE INFO | DOWNLOAD |
| 90 | Trukhmanov D.S., Dubov G.M., Chegoshev A.A., Eltsov I.E., Nokhrin S.A. Technique for evaluating cost-performance ratio of on-board cryogenic fuel systems of lng-fuelled belaz mining dump trucks. Mining equipment and electromechanics. 2021; 3(155):32-38. (In Russ., abstract in Eng.). DOI: 10.26730/1816-4528-2021-3-32-38 | MORE INFO | DOWNLOAD |
| 91 | Aksenov V.V., Khoreshok A.A., Beglyakov V.Yu., Pashkov D.А. Geodynamics of underground apparatuses. The formula is a specialty, research. Mining equipment and electromechanics. 2021; 3(155):39-47. (In Russ., abstract in Eng.). DOI: 10.26730/1816-4528-2021-3-39-47 | MORE INFO | DOWNLOAD |
| 92 | Zhabin A.B., Lavit I. M., Kerimov Z.E. Results of striker/tool interaction studies in percussive destruction of rocks. Mining equipment and electromechanics. 2021; 3(155):48-53. (In Russ., abstract in Eng.). DOI: 10.26730/1816-4528-2021-3-48-53 | MORE INFO | DOWNLOAD |
| 93 | Lekontsev Yu.,M., Khoreshok A.A., Sazhin P.V., Mezentsev Yu.B. Investigation and calculation of polyurethane packer elements for axial compression. Mining equipment and electromechanics. 2021; 4(156):3-8. (In Russ., abstract in Eng.). DOI: 10.26730/1816-4528-2021-4-3-8 | MORE INFO | DOWNLOAD |
| 94 | Klishin V.I., Malakhov Yu.V. Organizational aspects of high-speed development of underground mine workings using powered walking support. Mining equipment and electromechanics. 2021; 4(156):9-15. (In Russ., abstract in Eng.). DOI: 10.26730/1816-4528-2021-4-9-15 | MORE INFO | DOWNLOAD |
| 95 | Linnik Yu.N., Linnik V.Yu. Mechanisms of maximal loads on cutters and cutting heads of coal mining machines. Mining equipment and electromechanics. 2021; 4(156):16-21. (In Russ., abstract in Eng.). DOI: 10.26730/1816-4528-2021-4-16-21 | MORE INFO | DOWNLOAD |
| 96 | Mametyev L.E., Khoreshok A.A., Tsekhin A.M., Borisov A.Yu. Increasing the mounting and dismounting capacity of reverse- stroke reamers for drilling rising wells. Mining equipment and electromechanics. 2021; 4(156):22-28. (In Russ., abstract in Eng.). DOI: 10.26730/1816-4528-2021-4-22-28 | MORE INFO | DOWNLOAD |
| 97 | Kuzin E.G., Barder M.V. Justification of the use of filter systems in hydraulic systems of mechanized treatment complexes. Mining equipment and electromechanics. 2021; 4(156):29-36. (In Russ., abstract in Eng.). DOI: 10.26730/1816-4528-2021-4-29-36 | MORE INFO | DOWNLOAD |
| 98 | Aksenov V.V., Kazantsev A.A., Sadovets V.Yu. Development of requirements for the tunnel lining construction system for geokhod technology. Mining equipment and electromechanics. 2021; 4(156):37-44. (In Russ., abstract in Eng.). DOI: 10.26730/1816-4528-2021-4-37-44 | MORE INFO | DOWNLOAD |
| 99 | Buyalich G.D., Husnutdinov M.K. Mining machinery and equipment as the product of inventive activity in KuzSTU. Mining equipment and electromechanics. 2021; 4(156):45-51. (In Russ., abstract in Eng.). DOI: 10.26730/1816-4528-2021-4-45-51 | MORE INFO | DOWNLOAD |
| 100 | Gericke P.B., Gericke B.L. Selection and justification of a unified criterion for diagnostics of unbalanced rotors of energy and mechanical equipment for electrical mining shovels. Mining equipment and electromechanics. 2021; 4(156):52-59. (In Russ., abstract in Eng.). DOI: 10.26730/1816-4528-2021-4-52-59 | MORE INFO | DOWNLOAD |
| 101 | Ananyev K.A., Ermakov A.N., Dubinkin D.M., Kartashov A.B., Pikalov N.A. Development of a hydraulic steering system option autonomous mining dump truck. Mining equipment and electromechanics. 2021; 5(157):3-9. (In Russ., abstract in Eng.). DOI: 10.26730/1816-4528-2021-5-3-9 | MORE INFO | DOWNLOAD |
| 102 | Dubinkin D.M., Pashkov D.А., Ushakov A.E. Type of front suspension justification of an autonomous mining dump truck with a load capacity of up to 90 tons. Mining equipment and electromechanics. 2021; 5(157):10-18. (In Russ., abstract in Eng.). DOI: 10.26730/1816-4528-2021-5-10-18 | MORE INFO | DOWNLOAD |
| 103 | Dubov G.M., Trukhmanov D.S., Chegoshev A.A., Nokhrin S.A., Eltsov I.E. Reducing the anthropogenic impact on the environment by using alternative energy carriers when operating heavy dump trucks. Mining equipment and electromechanics. 2021; 5(157):19-28. (In Russ., abstract in Eng.). DOI: 10.26730/1816-4528-2021-5-19-28 | MORE INFO | DOWNLOAD |
| 104 | Buriy G.G. Investigation of the process of penetration into the soil of the working body of a mining machine. Mining equipment and electromechanics. 2021; 5(157):29-34. (In Russ., abstract in Eng.). DOI: 10.26730/1816-4528-2021-5-29-34 | MORE INFO | DOWNLOAD |
| 105 | Suslov N.M., Suslov D.N., Chernukhin S.A., Ivanov I.Yu. Mathematical modeling of the dragline travel mechanism with sliding supports. Mining equipment and electromechanics. 2021; 5(157):35-40. (In Russ., abstract in Eng.). DOI: 10.26730/1816-4528-2021-5-35-40 | MORE INFO | DOWNLOAD |
| 106 | Bezkorovayny P.G., Shestakov V.S., Nesterov V.I. Optimization of work equipment hydraulic excavators. Mining equipment and electromechanics. 2021; 6(158):3-8. (In Russ., abstract in Eng.). DOI: 10.26730/1816-4528-2021-6-3-8 | MORE INFO | DOWNLOAD |
| 107 | Makarova V.V., Lagunova Yu.A., Kovyazin R.A., Nesterov V.I. A new approach to creation of hydraulic excavators. Mining equipment and electromechanics. 2021; 6(158):9-14. (In Russ., abstract in Eng.). DOI: 10.26730/1816-4528-2021-6-9-14 | MORE INFO | DOWNLOAD |
| 108 | Komissarov A.P., Shestakov V.S., Nabiullin R.S. Research of loading of working equipment of hydraulic excavator «Back shovel». Mining equipment and electromechanics. 2021; 6(158):15-20. (In Russ., abstract in Eng.). DOI: 10.26730/1816-4528-2021-6-15-20 | MORE INFO | DOWNLOAD |
| 109 | Ibrayeva N.R. Analysis of the scope of neural networks in mining machines. Mining equipment and electromechanics. 2021; 6(158):21-25. (In Russ., abstract in Eng.). DOI: 10.26730/1816-4528-2021-6-21-25 | MORE INFO | DOWNLOAD |
| 110 | Bochkova K.V., Bochkov V.S. Research of primary ore preparation at hard-to-access deposits. Mining equipment and electromechanics. 2021; 6(158):26-31. (In Russ., abstract in Eng.). DOI: 10.26730/1816-4528-2021-6-26-31 | MORE INFO | DOWNLOAD |
| 111 | Afanasyev A.I., Potapov V.Ya., Stozhkov D.S., Potapov V.V., Chirkova A.A. Electric pulse destruction of balanced copper-zinc ore. Mining equipment and electromechanics. 2021; 6(158):32-37. (In Russ., abstract in Eng.). DOI: 10.26730/1816-4528-2021-6-32-37 | MORE INFO | DOWNLOAD |
| 112 | Andreeva L.I. Methodological approach to evaluating the condition of mining machines and the practical period of its operation. Mining equipment and electromechanics. 2021; 6(158):38-43. (In Russ., abstract in Eng.). DOI: 10.26730/1816-4528-2021-6-38-43 | MORE INFO | DOWNLOAD |
| 113 | Nabiullin R.Sh. Preparation for planning an experiment based on a mathematical model of operating equipment of a mining excavator. Mining equipment and electromechanics. 2021; 6(158):44-48. (In Russ., abstract in Eng.). DOI: 10.26730/1816-4528-2021-6-44-48 | MORE INFO | DOWNLOAD |
| 114 | Dubov G.M., Trukhmanov D.S., Chegoshev A.A., Nokhrin S.A., Eltsov I.E. Development of technical requirements for on-board cryogenic fuel systems of BelAZ dump trucks. Mining equipment and electromechanics. 2021; 6(158):49-58. (In Russ., abstract in Eng.). DOI: 10.26730/1816-4528-2021-6-49-58 | MORE INFO | DOWNLOAD |
| 115 | Dubinkin D.M., Kartashov A.B., Arutyunyan G.A., Kolyako A.V., Sadovets V.Yu., Pashkov D.А. Development of a program and methodology for preliminary testing of an autonomous quarry dump truck. Mining equipment and electromechanics. 2021; 6(158):59-65. (In Russ., abstract in Eng.). DOI: 10.26730/1816-4528-2021-6-59-65 | MORE INFO | DOWNLOAD |
| 116 | Dadonov M.V., Kulpin A.G. Redistribution of loads on the wheels of quarry dump trucks due to the impact of aerodynamic loads. Mining equipment and electromechanics. 2022; 1(159):3-8. (In Russ., abstract in Eng.). DOI: 10.26730/1816-4528-2022-1-3-8 | MORE INFO | DOWNLOAD |
| 117 | Lipnitsky N.A. Ustinova Ya.V. Calculation algorithm for inter-barrier pillar width when mining potash deposits with different mining equipment in order to reduce operational losses. Mining equipment and electromechanics. 2022; 1(159):9-18. (In Russ., abstract in Eng.). DOI: 10.26730/1816-4528-2022-1-9-18 | MORE INFO | DOWNLOAD |
| 118 | Barkhatov S.P., Ustinova Ya.V., Semenov A.S. Studying the possibilities of using robotic dump trucks in the mining industry. Mining equipment and electromechanics. 2022; 1(159):19-27. (In Russ., abstract in Eng.). DOI: 10.26730/1816-4528-2022-1-19-27 | MORE INFO | DOWNLOAD |
| 119 | Pashko P.B., Yablonev A.L. Calculation of the parameters of the dispersant for the preparation of the emul-sion of power roof supports. Mining equipment and electromechanics. 2022; 1(159):28-35. (In Russ., abstract in Eng.). DOI: 10.26730/1816-4528-2022-1-28-35 | MORE INFO | DOWNLOAD |
| 120 | Khazhiev V.A. The concept of development of the operation system of the tech-nological complex of the mining enterprise. Mining equipment and electromechanics. 2022; 2(160):3-13. (In Russ., abstract in Eng.). DOI: 10.26730/1816-4528-2022-2-3-13 | MORE INFO | DOWNLOAD |
| 121 | Khazhiev V.A. Methodological approach to assessing the efficiency of the system operation of the equipment of the technological complex of the mining enterprise. Mining equipment and electromechanics. 2022; 2(160):14-21. (In Russ., abstract in Eng.). DOI: 10.26730/1816-4528-2022-2-14-21 | MORE INFO | DOWNLOAD |
| 122 | Yablonev A.L., Shcherbakova D.M. Research and determination of rational parameters of the installation of the suction nozzle of a pneumatic peat harvester. Mining equipment and electromechanics. 2022; 2(160):22-30. (In Russ., abstract in Eng.). DOI: 10.26730/1816-4528-2022-2-22-30 | MORE INFO | DOWNLOAD |
| 123 | Khudyntsev E.A., Klishin S.V., Klishin V.I. Researching powered support feeder for extracting thick flat-lying seams with controlled coal release. Mining equipment and electromechanics. 2022; 2(160):31-38. (In Russ., abstract in Eng.). DOI: 10.26730/1816-4528-2022-2-31-38 | MORE INFO | DOWNLOAD |
| 124 | Dubinkin D.M. Justification of the need to create heavy platforms for open-pit mining. Mining equipment and electromechanics. 2022; 2(160):39-50. (In Russ., abstract in Eng.). DOI: 10.26730/1816-4528-2022-2-39-50 | MORE INFO | DOWNLOAD |
| 125 | Vishnyakov G.Yu., Botyan E.Yu. Evaluation of modern monitoring systems of dump trucks. Mining equipment and electromechanics. 2022; 2(160):51-57. (In Russ., abstract in Eng.). DOI: 10.26730/1816-4528-2022-2-51-57 | MORE INFO | DOWNLOAD |
| 126 | Doronin S.V., Alshanskaya A.A., Gerasimova Т.А. Multilevel digital models of the loads on the load bearing structures of the working equipment of the quarry excavator. Mining equipment and electromechanics. 2022; 2(160):58-65. (In Russ., abstract in Eng.). DOI: 10.26730/1816-4528-2022-2-58-65 | MORE INFO | DOWNLOAD |
| 127 | Sadovets V.Yu., Rezanova E.V., Sadovets R.V., Sannikov A.K. Development of requirements for the inertial positioning system of mining machines. Mining equipment and electromechanics. 2022; 3(161):3-12. (In Russ., abstract in Eng.). DOI: 10.26730/1816-4528-2022-3-3-12 | MORE INFO | DOWNLOAD |
| 128 | Gericke P.B., Gericke B.L. Application of uniform criteria for diagnostics of compressors of electric mining shovels. Mining equipment and electromechanics. 2022; 3(161):13-22. (In Russ., abstract in Eng.). DOI: 10.26730/1816-4528-2022-3-13-22 | MORE INFO | DOWNLOAD |
| 129 | Nosenko A.S., Domnitskiy A.A., Nosenko V.V., Kirsanov I.A. Theoretical research of the operation of the transfer bunker with gravitational loading of material. Mining equipment and electromechanics. 2022; 3(161):23-30. (In Russ., abstract in Eng.). DOI: 10.26730/1816-4528-2022-3-23-30 | MORE INFO | DOWNLOAD |
| 130 | Dubinkin D.M. Method of determining the loads acting during loading and unloading of the cargo platform (body) career self-dump. Mining equipment and electromechanics. 2022; 3(161):31-49. (In Russ., abstract in Eng.). DOI: 10.26730/1816-4528-2022-3-31-49 | MORE INFO | DOWNLOAD |
| 131 | Serzhan S.L., Malevannyi D.V., Fedorov E.V., Dadayan L.M. Prospects of application of a production complex with a capsule in the conditions of mining on the Russian Federation shelf iron-manganese nodules. Mining equipment and electromechanics. 2022; 4(162):3-11. (In Russ., abstract in Eng.). DOI: 10.26730/1816-4528-2022-4-3-11 | MORE INFO | DOWNLOAD |
| 132 | Vishnyakov G.Yu., Botyan E.Yu., Rozov R.A., Pushkarev A.E. Refinement of the methodology for rationing fuel consumption of open pits haul trucks in difficult mining conditions. Mining equipment and electromechanics. 2022; 4(162):12-19. (In Russ., abstract in Eng.). DOI: 10.26730/1816-4528-2022-4-12-19 | MORE INFO | DOWNLOAD |
| 133 | Efimov D.A., Gospodarikov A.P. Prospects for the use of reuleaux triangle rollers in crushers and high-pressure grinding rolls. Mining equipment and electromechanics. 2022; 4(162):36-43. (In Russ., abstract in Eng.). DOI: 10.26730/1816-4528-2022-4-36-43 | MORE INFO | DOWNLOAD |
| 134 | Lieberman Ya.L., Letnev Ko.Yu., Gorbunova L.N. About optimal drummer control excavator bucket of active action. Mining equipment and electromechanics. 2022; 5(163):3-7. (In Russ., abstract in Eng.). DOI: 10.26730/1816-4528-2022-5-3-7 | MORE INFO | DOWNLOAD |
| 135 | Mametyev L.E., Khoreshok A.A., Tsekhin A.M., Borisov A.Yu., Merzlyakov V.G. Development of a tool for multi-stage drilling of rising wells. Mining equipment and electromechanics. 2022; 5(163):8-16. (In Russ., abstract in Eng.). DOI: 10.26730/1816-4528-2022-5-8-16 | MORE INFO | DOWNLOAD |
| 136 | Israfilov R.G., Shigin A.O. Modernization of bucket attachment units to bucket elevator traction elements. Mining equipment and electromechanics. 2022; 5(163):17-22. (In Russ., abstract in Eng.). DOI: 10.26730/1816-4528-2022-5-17-22 | MORE INFO | DOWNLOAD |
| 137 | Nickolay P.O. Analysis of the reliability level of sectional pumps of the main drainage system of the Udachny underground mine. Mining equipment and electromechanics. 2022; 5(163):23-28. (In Russ., abstract in Eng.). DOI: 10.26730/1816-4528-2022-5-23-28 | MORE INFO | DOWNLOAD |
| 138 | Dadonov M.V., Kulpin A.G., Stenin D.V. Influence of maximum permissible flows and long-permissible current loads on scheme-mode operations of the electric power network. Mining equipment and electromechanics. 2022; 5(163):29-35. (In Russ., abstract in Eng.). DOI: 10.26730/1816-4528-2022-5-29-35 | MORE INFO | DOWNLOAD |
| 139 | Andreeva L.I., Danilkin A.A. Assessment of factors influencing the performance of equipment operating in the conditions of development of mining systems. Mining equipment and electromechanics. 2023; 4(168):20-27. (In Russ., abstract in Eng.). DOI: 10.26730/1816-4528-2023-4-20-27 | MORE INFO | DOWNLOAD |
| 140 | Andreeva L.I. Mining enterprise: equipment, technology, personnel. methods of integrated assessment. Mining equipment and electromechanics. 2023; 4(168):28-35. (In Russ., abstract in Eng.). DOI: 10.26730/1816-4528-2023-4-28-35 | MORE INFO | DOWNLOAD |
| 141 | Kravchuk I.L., Andreeva L.I. Risk assessment of the operation of mining machinery and equipment in the changing operation conditions of a mining enterprise. Mining equipment and electromechanics. 2023; 4(168):36-47. (In Russ., abstract in Eng.). DOI: 10.26730/1816-4528-2023-4-36-47 | MORE INFO | DOWNLOAD |
| 142 | Lugantsev B.B., Sysoev N.I., Turuk Yu.V. Device for adjusting the position of the ploughing system by the seam gradient. Mining equipment and electromechanics. 2023; 4(168):48-54. (In Russ., abstract in Eng.). DOI: 10.26730/1816-4528-2023-4-48-54 | MORE INFO | DOWNLOAD |
| 143 | Mamaeva M.S., Goryunov S.V., Khoreshok A.A. The influence of the properties of moisture-containing soils on the efforts of resistance to digging with a bucket excavator type "reverse bucket". Mining equipment and electromechanics. 2024; 2(172):51-58. (In Russ., abstract in Eng.). DOI: 10.26730/1816-4528-2024-2-51-58 | MORE INFO | DOWNLOAD |
| 144 | Andreeva L.I. Monitoring of the technical condition of mining machines as a method of determining the economic feasibility of its operation. Mining equipment and electromechanics. 2024; 2(172):59-64. (In Russ., abstract in Eng.). DOI: 10.26730/1816-4528-2024-2-59-64 | MORE INFO | DOWNLOAD |
This work is licensed under a Creative Commons Attribution 4.0 License.